ANU RN Robertson Building
Quattro was responsible for delivering renovation works on the ANU RN Robertson Building.
Similar to the Florey Building, this was an existing structure which was opened in 1972.
Key items included:
Use of recycled timber out of the demolition works to reinstall as timber ceilings through thoroughfares in the atrium area
Install of aluminium frames to existing rendered openings
Airtight construction of negative pressure labs
Australian National University
Project Manager: Daniel Taylor
Location: ANU Campus ACT
Value: $3.7 million
Completion: September 2019